PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavating for the underground Tele-Data connecting the New Court House Facing South  (800x600).jpg Finished stripping the shear wall panels at Elev. 1,2,3 (4th Floor) Facing West (800x600).jpg Started stripping the shear wall panels at Elev. 1,2,3 (4th Floor) Facing South (800x600).jpg Stripping the bearing plate boxes at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600).jpg Installing the underground Tele-Data piping connecting the new Court House Facing North (800x600).jpg
Previous pageNext page Stripping the bearing plate boxes at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600)
Stripping the bearing plate boxes at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600)